Skip to content
Show Menu

Accuracy Wind Turbine Anchoring

Galliford Try

Accuracy of Wind Turbine Anchoring

What is the project:

When wind turbines are built they are anchored into concrete foundations. In this project, you will examine correct placement of the anchor by investigating tolerances of different positions alongside engineers’ drawings.

How this project is useful:

By studying the impact of small changes in positioning, Galliford Try can ensure long-term structural alignment. This is needed to ensure safe and reliable offshore wind energy.

Project outcome:

  • Document your measurements and analysis
  • Written report explaining how positional controls contribute to quality, safety, and long-term success

Project type:

Practical Investigation

Key skills:

  • Data analysis
  • Communication

Location:

On site at:

ORE Catapult site, Albert St, Blyth, NE24 1LZ

Company information:

Galliford Try is a UK-based construction and infrastructure company that manages large building projects from start to finish.

Company contact: Matthew Naylor

Visit the Galliford Try website for more information about the host company